{"id":1,"date":"2025-01-29T17:25:55","date_gmt":"2025-01-29T17:25:55","guid":{"rendered":"https:\/\/werbusiness.ro\/?p=1"},"modified":"2025-02-11T08:22:51","modified_gmt":"2025-02-11T08:22:51","slug":"the-technical-book-of-the-construction-in-romania","status":"publish","type":"post","link":"https:\/\/werbusiness.ro\/ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/","title":{"rendered":"Cartea Tehnic\u0103 a Construc\u021biei \u00een Rom\u00e2nia"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"1\" class=\"elementor elementor-1\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2a42214d e-flex e-con-boxed e-con e-parent\" data-id=\"2a42214d\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1d7590a8 elementor-widget elementor-widget-text-editor\" data-id=\"1d7590a8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p class=\"wp-block-paragraph\">The <strong>Technical Book of the Construction<\/strong> is a crucial document that compiles and preserves all technical information related to the <strong>design, execution, reception, operation, and ongoing monitoring<\/strong> of a building and its associated installations. Its primary purpose is to ensure that anyone who examines the structure, now or in the future, has immediate access to all relevant data needed to <strong>identify and evaluate<\/strong> the building\u2019s technical condition as it evolves over time.<\/p>\n\n<p class=\"wp-block-paragraph\">Below is an overview of the main components of the Technical Book of the Construction, as set out in <strong>Annex No. 6 of Government Decision (H.G.) 273\/1994<\/strong>, which approves the <em>Regulation for the Reception of Construction Works and Related Installations<\/em>.<\/p>\n\n<h4 class=\"wp-block-heading\"><strong>A. General Centralizer of the Technical Book<\/strong><\/h4>\n\n<p class=\"wp-block-paragraph\">Also referred to as the \u201csheet with synthetic data regarding the construction,\u201d this section provides a <strong>concise summary<\/strong> of the entire documentation included in the technical book. It usually contains:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>A <strong>general slip<\/strong> of the files making up the basic documentation.<\/li>\n\n<li>A set of <strong>copies<\/strong> of the slips for each separate file.<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\"><strong>B. Design Documentation<\/strong><\/h4>\n\n<p class=\"wp-block-paragraph\"><strong>Project Background and Location Documents<\/strong><\/p>\n\n<ol class=\"wp-block-list\">\n<li>Proof of the <strong>design theme<\/strong> (requirements, objectives).<\/li>\n\n<li>Documents describing the <strong>location<\/strong> of the construction, including zoning details and site conditions.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Supporting Opinions and Approvals<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"3\">\n<li>Various <strong>opinions<\/strong> or <strong>permits<\/strong> that justified and substantiated the development of the project (e.g., environmental clearances, urban planning certificates).<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Technical Documentation of the Final As-Built Construction<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"4\">\n<li><strong>Architectural plans<\/strong>, including any amendments made during execution.<\/li>\n\n<li><strong>Execution details<\/strong> for the load-bearing structure (resistance structure).<\/li>\n\n<li><strong>Installation schemes<\/strong> (electrical, HVAC, plumbing, etc.).<\/li>\n\n<li><strong>Modifications<\/strong> introduced by the designer, builder, or beneficiary during execution, documented through site provisions or supplementary projects.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Calculation Breviaries for Each Specialty<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"8\">\n<li>Structural analysis, equipment sizing, or other technical calculations.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Recorded Differences from the Original Technical Plans<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"9\">\n<li>Clear statements of any <strong>deviations<\/strong> from the approved technical projects or execution details, including the causes.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Execution Specifications<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"10\">\n<li>Written instructions regarding <strong>work procedures, materials, and quality standards<\/strong> to be followed during construction.<\/li>\n<\/ol>\n\n<h4 class=\"wp-block-heading\"><strong>C. Documentation Regarding Execution<\/strong><\/h4>\n\n<p class=\"wp-block-paragraph\"><strong>Building Permit<\/strong><\/p>\n\n<ol class=\"wp-block-list\">\n<li>The <strong>construction authorization<\/strong> (<em>autoriza\u021bie de construire<\/em>) and any attached plans, which must remain unchanged throughout the project.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Site Handover and Leveling Benchmark<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li>Signed <strong>minutes<\/strong> of handing over the site and the initial reference points to the contractor.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Reception of Foundation, Structure, and Hidden Works<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"3\">\n<li><strong>Minutes<\/strong> documenting the acceptance of the <strong>foundation soil<\/strong>, the <strong>foundations<\/strong>, the <strong>resistance structure<\/strong>, and any <strong>hidden works<\/strong>.<\/li>\n\n<li><strong>Phase Acceptance<\/strong> for critical stages (<em>fazele determinante<\/em>) identified in the project and verified by the site supervisor, designer, or authorities.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Technical Expertise (When Applicable)<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"5\">\n<li>If the construction was not supervised by an <strong>authorized site supervisor<\/strong> (<em>diriginte de \u0219antier<\/em>) or if the required acceptance phases and hidden works minutes are missing, a <strong>technical expertise<\/strong> must confirm the quality of execution.<\/li>\n\n<li>Any remediation measures suggested by the expertise and the <strong>minutes<\/strong> confirming their correct execution.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Material Quality Documents<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"7\">\n<li><strong>Quality certificates<\/strong>, concrete condition reports, results of <strong>concrete strength tests<\/strong>, and certificates for <strong>all materials<\/strong> incorporated into the building.<\/li>\n\n<li>The <strong>register of hidden works<\/strong>, <strong>inspection notes<\/strong> from control authorities, and the <strong>log of directives and site notes<\/strong>.<\/li>\n\n<li>Records of major events (floods, earthquakes, extreme temperatures) that occurred during construction.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Measuring Installations for Monitoring<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"10\">\n<li><strong>Minutes<\/strong> showing the installation of any <strong>monitoring devices<\/strong> specified in the project, including their <strong>initial readings<\/strong> that establish the starting point for future measurements.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Additional Documentation<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"11\">\n<li><strong>Technical expertise<\/strong>, on-site checks, or <strong>further research<\/strong> needed due to technical issues, accidents, or design errors (if applicable).<\/li>\n<\/ol>\n\n<h4 class=\"wp-block-heading\"><strong>D. Documentation Regarding the Reception of Executed Works<\/strong><\/h4>\n\n<p class=\"wp-block-paragraph\"><strong>Reception Minutes<\/strong><\/p>\n\n<ol class=\"wp-block-list\">\n<li>The <strong>minutes drawn up at the end of the works<\/strong> (provisional reception).<\/li>\n\n<li>The <strong>final reception minutes<\/strong> issued after the mandatory monitoring period, if applicable.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Additional Documents<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"3\">\n<li>Any documents required by the reception commission, including <strong>verification reports<\/strong> or <strong>supplementary research<\/strong>, their findings, and solutions for resolving any identified issues.<\/li>\n<\/ol>\n\n<h4 class=\"wp-block-heading\"><strong>E. Monitoring the Construction\u2019s Behavior and Interventions Over Time<\/strong><\/h4>\n\n<p class=\"wp-block-paragraph\"><strong>Designer\u2019s Written Provisions<\/strong><\/p>\n\n<ol class=\"wp-block-list\">\n<li><strong>Instructions<\/strong> on how to monitor the behavior of the structure over its operational lifetime, as well as <strong>operation and maintenance guidelines<\/strong>.<\/li>\n\n<li>A list of the <strong>basic technical prescriptions<\/strong> to be followed during the building\u2019s usage.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Construction Modification Projects<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"3\">\n<li>Any changes made to the structure <strong>after the final reception<\/strong> must be documented. This includes expansions, redesigns, or retrofits.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Deficiencies and Interventions<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"4\">\n<li>Records of any <strong>issues<\/strong> that appear after final reception, alongside details about <strong>corrective measures<\/strong> taken.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Change of Ownership<\/strong><\/p>\n\n<ol class=\"wp-block-list\" start=\"5\">\n<li><strong>Minutes<\/strong> documenting the handover of the building when ownership is transferred, ensuring the new owner fully understands the building\u2019s technical status.<\/li>\n<\/ol>\n\n<h4 class=\"wp-block-heading\"><strong>Why Is the Technical Book Important?<\/strong><\/h4>\n\n<ul class=\"wp-block-list\">\n<li><strong>Long-Term Traceability<\/strong>: It creates a complete history of the construction, from inception to operation, allowing for easy future reference.<\/li>\n\n<li><strong>Quality &amp; Safety Assurance<\/strong>: Ensures the building was designed, built, and maintained according to regulatory requirements and best practices.<\/li>\n\n<li><strong>Regulatory Compliance<\/strong>: The technical book is required by law, providing a formal record in case of inspections or legal inquiries.<\/li>\n\n<li><strong>Property Value &amp; Responsibility<\/strong>: A well-maintained technical book can positively impact <strong>property valuation<\/strong> and simplify <strong>ownership transfers<\/strong> by providing all necessary data on the structure\u2019s condition.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">The <strong>Technical Book of the Construction<\/strong> is an essential document for maintaining and verifying the <strong>quality, safety, and compliance<\/strong> of any building in Romania. It centralizes <strong>all design, execution, reception, and operational records<\/strong> to ensure transparency and accountability throughout a building\u2019s lifecycle. By adhering to <strong>H.G. 273\/1994<\/strong> requirements and keeping the technical book up to date, owners, builders, and authorities can ensure a <strong>safe, well-documented, and properly maintained<\/strong> construction for years to come.<\/p>\n\n<p class=\"wp-block-paragraph\">\u00a0<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>The Technical Book of the Construction is a crucial document that compiles and preserves all technical information related to the design, execution, reception, operation, and ongoing monitoring of a building and its associated installations. Its primary purpose is to ensure that anyone who examines the structure, now or in the future, has immediate access to&#8230;<\/p>","protected":false},"author":1,"featured_media":44597,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[73],"tags":[],"class_list":["post-1","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/werbusiness.ro\/ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting\" \/>\n<meta property=\"og:description\" content=\"The Technical Book of the Construction is a crucial document that compiles and preserves all technical information related to the design, execution, reception, operation, and ongoing monitoring of a building and its associated installations. Its primary purpose is to ensure that anyone who examines the structure, now or in the future, has immediate access to...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/werbusiness.ro\/ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\" \/>\n<meta property=\"og:site_name\" content=\"Werbusiness Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-29T17:25:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-11T08:22:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/werbusiness.ro\/#\/schema\/person\/bd102de0c97e93378eba64a7423e364c\"},\"headline\":\"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania\",\"datePublished\":\"2025-01-29T17:25:55+00:00\",\"dateModified\":\"2025-02-11T08:22:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\"},\"wordCount\":913,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/werbusiness.ro\/#organization\"},\"image\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg\",\"articleSection\":[\"Construction\"],\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\",\"url\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\",\"name\":\"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting\",\"isPartOf\":{\"@id\":\"https:\/\/werbusiness.ro\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg\",\"datePublished\":\"2025-01-29T17:25:55+00:00\",\"dateModified\":\"2025-02-11T08:22:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage\",\"url\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg\",\"contentUrl\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/werbusiness.ro\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/werbusiness.ro\/#website\",\"url\":\"https:\/\/werbusiness.ro\/\",\"name\":\"WerBusiness\",\"description\":\"Business Consulting and Services Firm\",\"publisher\":{\"@id\":\"https:\/\/werbusiness.ro\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/werbusiness.ro\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/werbusiness.ro\/#organization\",\"name\":\"WerBusiness Consulting\",\"url\":\"https:\/\/werbusiness.ro\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/werbusiness.ro\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/Logo-Site-V1.png\",\"contentUrl\":\"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/Logo-Site-V1.png\",\"width\":1034,\"height\":230,\"caption\":\"WerBusiness Consulting\"},\"image\":{\"@id\":\"https:\/\/werbusiness.ro\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/werbusiness-consulting\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/werbusiness.ro\/#\/schema\/person\/bd102de0c97e93378eba64a7423e364c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/werbusiness.ro\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b39fc2dd6f7e16acdaf8b6d12c76151a141123cb7a209f178c4bfb682fe1fc9d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b39fc2dd6f7e16acdaf8b6d12c76151a141123cb7a209f178c4bfb682fe1fc9d?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/werbusiness.ro\"],\"url\":\"https:\/\/werbusiness.ro\/ro\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/werbusiness.ro\/ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/","og_locale":"ro_RO","og_type":"article","og_title":"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting","og_description":"The Technical Book of the Construction is a crucial document that compiles and preserves all technical information related to the design, execution, reception, operation, and ongoing monitoring of a building and its associated installations. Its primary purpose is to ensure that anyone who examines the structure, now or in the future, has immediate access to...","og_url":"https:\/\/werbusiness.ro\/ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/","og_site_name":"Werbusiness Consulting","article_published_time":"2025-01-29T17:25:55+00:00","article_modified_time":"2025-02-11T08:22:51+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"admin","Timp estimat pentru citire":"4 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#article","isPartOf":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/"},"author":{"name":"admin","@id":"https:\/\/werbusiness.ro\/#\/schema\/person\/bd102de0c97e93378eba64a7423e364c"},"headline":"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania","datePublished":"2025-01-29T17:25:55+00:00","dateModified":"2025-02-11T08:22:51+00:00","mainEntityOfPage":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/"},"wordCount":913,"commentCount":0,"publisher":{"@id":"https:\/\/werbusiness.ro\/#organization"},"image":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage"},"thumbnailUrl":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg","articleSection":["Construction"],"inLanguage":"ro-RO","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/","url":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/","name":"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania - Werbusiness Consulting","isPartOf":{"@id":"https:\/\/werbusiness.ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage"},"image":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage"},"thumbnailUrl":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg","datePublished":"2025-01-29T17:25:55+00:00","dateModified":"2025-02-11T08:22:51+00:00","breadcrumb":{"@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#primaryimage","url":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg","contentUrl":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/helmet-drafting-supplies-blueprints-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/werbusiness.ro\/2025\/01\/29\/the-technical-book-of-the-construction-in-romania\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/werbusiness.ro\/"},{"@type":"ListItem","position":2,"name":"The Technical Book of the Construction (Cartea tehnic\u0103 a construc\u021biei) in Romania"}]},{"@type":"WebSite","@id":"https:\/\/werbusiness.ro\/#website","url":"https:\/\/werbusiness.ro\/","name":"WerBusiness","description":"Business Consulting and Services Firm","publisher":{"@id":"https:\/\/werbusiness.ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/werbusiness.ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/werbusiness.ro\/#organization","name":"WerBusiness Consulting","url":"https:\/\/werbusiness.ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/werbusiness.ro\/#\/schema\/logo\/image\/","url":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/Logo-Site-V1.png","contentUrl":"https:\/\/werbusiness.ro\/wp-content\/uploads\/2025\/02\/Logo-Site-V1.png","width":1034,"height":230,"caption":"WerBusiness Consulting"},"image":{"@id":"https:\/\/werbusiness.ro\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/werbusiness-consulting\/"]},{"@type":"Person","@id":"https:\/\/werbusiness.ro\/#\/schema\/person\/bd102de0c97e93378eba64a7423e364c","name":"admin","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/werbusiness.ro\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b39fc2dd6f7e16acdaf8b6d12c76151a141123cb7a209f178c4bfb682fe1fc9d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b39fc2dd6f7e16acdaf8b6d12c76151a141123cb7a209f178c4bfb682fe1fc9d?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/werbusiness.ro"],"url":"https:\/\/werbusiness.ro\/ro\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/posts\/1","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/comments?post=1"}],"version-history":[{"count":7,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/posts\/1\/revisions"}],"predecessor-version":[{"id":44600,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/posts\/1\/revisions\/44600"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/media\/44597"}],"wp:attachment":[{"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/media?parent=1"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/categories?post=1"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/werbusiness.ro\/ro\/wp-json\/wp\/v2\/tags?post=1"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}